ADU Builder in Marina del Rey, CA
Searching for ADU builder in Marina del Rey? Home Make Over builds across Marina del Rey and greater Los Angeles — licensed, bonded, and insured, with fixed written pricing and free estimates.
ADU Builder in Marina del Rey
Detached and attached accessory dwelling units — from design and permit through framing, utilities, and final walkthrough. We handle the LADBS permit path and JADU/ADU code so your unit is rentable and inspection-ready.
Waterfront properties with specific moisture and code needs. Every Marina del Rey project is run by one team from drawings to final walkthrough — no subcontractor runaround, no surprise pricing.
What's included
- Detached, attached & garage-conversion ADUs
- Design, drawings & city permit handling
- Full utilities: water, sewer, electrical sub-panel
- Title-24 energy compliance & inspections
- Rentable, move-in-ready finish
Why Marina del Rey homeowners choose Home Make Over
We're a full-service general contractor based nearby in Reseda, so we know Marina del Rey permitting, inspectors, and lot conditions. You get fixed written pricing before work starts, and we'll beat any legitimate estimate in town.
ADU Builder in Marina del Rey — FAQ
How much does an ADU cost in Marina del Rey?
Most Marina del Rey ADUs run about $150k–$350k depending on size, site work, and finishes. After a free on-site visit we give you fixed written pricing — no surprises — and we’ll beat any legitimate quote.
How long does it take to build an ADU in Marina del Rey?
Plan on roughly 2–4 months for design and permits in Marina del Rey, then 3–5 months of construction. We manage the LADBS/city path so it keeps moving.
Do I need a permit for an ADU in Marina del Rey?
Yes. ADUs require permits — we handle the drawings, submittal, and inspections for your Marina del Rey property so the finished unit is legal and rentable.