ADU Builder in West Hills, CA
Searching for ADU builder in West Hills? Home Make Over builds across West Hills and greater Los Angeles — licensed, bonded, and insured, with fixed written pricing and free estimates.
ADU Builder in West Hills
Detached and attached accessory dwelling units — from design and permit through framing, utilities, and final walkthrough. We handle the LADBS permit path and JADU/ADU code so your unit is rentable and inspection-ready.
Hillside builds and pools are a big part of our West Hills work. Every West Hills project is run by one team from drawings to final walkthrough — no subcontractor runaround, no surprise pricing.
What's included
- Detached, attached & garage-conversion ADUs
- Design, drawings & city permit handling
- Full utilities: water, sewer, electrical sub-panel
- Title-24 energy compliance & inspections
- Rentable, move-in-ready finish
Why West Hills homeowners choose Home Make Over
We're a full-service general contractor based nearby in Reseda, so we know West Hills permitting, inspectors, and lot conditions. You get fixed written pricing before work starts, and we'll beat any legitimate estimate in town.
ADU Builder in West Hills — FAQ
How much does an ADU cost in West Hills?
Most West Hills ADUs run about $150k–$350k depending on size, site work, and finishes. After a free on-site visit we give you fixed written pricing — no surprises — and we’ll beat any legitimate quote.
How long does it take to build an ADU in West Hills?
Plan on roughly 2–4 months for design and permits in West Hills, then 3–5 months of construction. We manage the LADBS/city path so it keeps moving.
Do I need a permit for an ADU in West Hills?
Yes. ADUs require permits — we handle the drawings, submittal, and inspections for your West Hills property so the finished unit is legal and rentable.